Tuesday, 17 March 2015

TR5 Progress

I haven't managed to do as much on the 5 as I had hoped because of family commitments and the CT Dinner, which left me wrecked last Sunday.

Anyway what I have done is this


Got the accelerator pedal fitted





Door locks in place





Door internals finished, all locks and catches work as they should





 I have started to make and fit up the clutch and brake lines - I have made these up with kunifer as its more durable than copper and doesn't work harden in the same way. Also it looks more like the original steel pipes.

Finally I collected the seat frames up, after being blasted and powder coated







I hope to get more done this weekend

No comments:

Post a Comment

Where am I?